Energy and environmental performanceEX-016

Hybrid renewable electricity at Sewagram

UltraTech Cement · Sewagram Cement Works, Gujarat, India · Date not stated

Use this record when

The decision this case can inform

Evaluate renewable supply through delivered energy and reliability, not capacity alone.

Evidence scope

Producer-reported evidence. This record establishes a milestone, not quantified operating savings.

Source-supported facts

What the public record actually establishes

2 sourced points
  1. F1

    A behind-the-meter hybrid wind, solar and battery arrangement was operationalized with Gentari.

  2. F2

    The producer identifies a 7.5 MW installation.

Structured interpretation

Facts and reported results are kept separate from the lesson a plant may choose to test.

01

Operating context

The site sought a steadier renewable electricity supply.

02

Intervention or finding

A behind-the-meter hybrid wind, solar and battery arrangement was operationalized with Gentari.

03

Documented result

The producer identifies a 7.5 MW installation.

04

Plant interpretation

Evaluate renewable supply through delivered energy and reliability, not capacity alone.

05

Transfer boundary

MW is capacity, not energy delivered; no verified annual generation or whole-plant off-grid performance is provided.

Before applying the lesson

Questions to verify at your plant

These are decision checks, not operating instructions. Resolve them through local risk assessment, technical review, and authorization.

  1. 01

    Request hourly delivery, storage duration, curtailment and residual grid supply.

  2. 02

    What equipment, materials and operating conditions differ at your plant?

  3. 03

    What baseline and follow-up evidence would establish whether this change works locally?