Safety and occupational healthSH-001

Dust and quartz exposure mapping at Cementon

Lehigh Cement Company · Cementon, New York · 1981

3 of 65 personal samples exceeded the then nuisance-dust standard; quartz was detected in 17% of respirable samples, mainly around raw materials.

Safety and occupational healthSH-002

Task-level dust and quartz exposure at Coplay

Coplay Cement Company · Nazareth, Pennsylvania · 1982

Four respirable nuisance-particulate samples exceeded 5 mg/m3; quartz appeared in 18 personal samples and six exceeded the then MSHA limit.

Safety and occupational healthSH-003

Preheater blockage and hot-material release

San Juan Cement Company · Cantera Espinosa, Dorado, Puerto Rico · 1996

Two workers died and three were burned when hot material was expelled into the occupied area.

Safety and occupational healthSH-004

Kiln dismantling fall through a removed handrail

Lafarge Corporation · Tampa Mill, Florida · 1997

A temporary worker stepped on rolling cribbing and fell 28 ft through the opening.

Safety and occupational healthSH-006

Ozone backdraft during kiln shutdown maintenance

Lehigh Portland Cement Company · Union Bridge, Maryland · 1997

Ozone measured 0.6-0.7 ppm in recreated conditions, above 0.7 ppm at a rear portal, and 4.5 ppm on a direct-reading meter.

Safety and occupational healthSH-007

Engulfment during cement-silo cleaning

Keystone Cement Company · Bath, Pennsylvania · 1999

Falling cement engulfed a contractor inside the silo.

Safety and occupational healthSH-008

Suspended scaffold failure inside a clinker silo

Ash Grove Cement Company · Durkee Cement Plant, Oregon · 1999

A weakened scaffold support failed and a worker fell about 100 ft.

Safety and occupational healthSH-009

Routine sampling beside an unguarded hot-dust pit

Royal Cement Company · Logandale, Nevada · 2000

A laboratory technician fell into 190-200 F caustic dust and died from burns and shock.

Safety and occupational healthSH-010

Known burner-trolley defects carried into commissioning

National Cement Company of California · Lebec Cement Plant, California · 2000

The 16,636-lb burner and trolley fell, killing one mechanic and seriously injuring two.

Safety and occupational healthSH-011

Fly-ash handling and total-dust exposure

Lehigh Portland Cement Company · Union Bridge, Maryland · 2001

Three of seven initial workers exceeded the then 10 mg/m3 total-dust criteria; quartz results were below applicable criteria.