Safety and occupational healthSH-012

Elevated valve created an avoidable fall exposure

Texas Lehigh Cement Company · Texas-Lehigh Cement Plant, Buda, Texas, USA · 2005

Use this record when

The decision this case can inform

Use this record when reviewing the reach, location, and operability of permanent or temporary valves, sample points, grease points, and service connections.

Evidence scope

Final MSHA fatal-accident investigation. It establishes the hazardous access arrangement and planning failure; the correct fall-control design remains site- and task-specific.

Source-supported facts

What the public record actually establishes

4 sourced points
  1. F1

    A temporary air-line valve and coupling were positioned roughly 6.75–7 feet above the walkway.

  2. F2

    The connection was outside the handrail beside a walkway inclined about 29 degrees.

  3. F3

    No pre-task risk assessment or fall protection addressed the access required to operate the connection.

  4. F4

    The welder/repairman fell 37 feet.

Structured interpretation

Facts and reported results are kept separate from the lesson a plant may choose to test.

01

Operating context

A temporary air-line valve and coupling were located about 7 ft above an inclined walkway outside the handrail.

02

Intervention or finding

MSHA found no pre-task risk assessment and no fall protection while the worker accessed the elevated connection.

03

Documented result

A welder/repairman fell 37 ft.

04

Plant interpretation

Design valves, sample points, grease points, and temporary connections for safe reach and stable work positioning.

05

Transfer boundary

The applicable fall-protection solution is task- and jurisdiction-specific.

Before applying the lesson

Questions to verify at your plant

These are decision checks, not operating instructions. Resolve them through local risk assessment, technical review, and authorization.

  1. 01

    Can the control be operated from a stable, guarded position within normal reach?

  2. 02

    Does a temporary installation create a new climbing, leaning, or handrail-bypass task?

  3. 03

    Who reviews human access before a temporary connection is released for use?

  4. 04

    Are similar valves, sample points, and lubrication points included in a plant-wide access-by-design audit?