SO2 dosing control and hydrate use at Rüdersdorf
CEMEX · Rüdersdorf · Date not stated
ABB reports 11% lower hydrate use and reduced variability.
Reviewed case library
Every record shows who reported the result, what was measured, and the strongest reason it may not transfer to your plant.
CEMEX · Rüdersdorf · Date not stated
ABB reports 11% lower hydrate use and reduced variability.
Holcim · Ternate · 2009
ABB reports 8% higher clinker production and 25% lower free-lime standard deviation.
CRH · Ożarów · 2011
A named implementation is documented; the page does not provide a defensible numerical savings result.
CalPortland · Oro Grande, California · 2021
The supplier describes an early large-clinker event passing through the replacement successfully.
CEMEX · Croatian cement operations · 2012 report
The source documents a maintenance-program implementation across Croatian operations.
Büyükçekmece Cement Plant · Istanbul, kiln 2 cyclone 4 · Date not stated
No buildup-related unscheduled shutdowns were reported in the treated section at the time of the account.
GCC Dakotah · Rapid City, South Dakota · Date not stated
The overhaul was completed during an 11-day scheduled outage.
Çimentaş · İzmir preheater tower · Date not stated
The supplier reports no subsequent manual cleaning in that tower at the time of reporting.
Drake Cement · Paulden, Arizona · After 2011 start-up
Martin Engineering reports about 100 short tons/hour and no manual-cleanout shutdowns after the first year of operation. The end date of that observation is not stated.
Lafarge Brasil · Matozinhos, Minas Gerais · Date not stated
The supplier documents installation and remote pneumatic operation over approximately 12 metres.
JK Cement · Mangrol · 2015–2017 fiscal years
Company submission reports total electricity intensity 71.7→65.7 kWh/t cement; grinding 30.6→27.5; thermal intensity 703→682 kcal/kg clinker.
Huixian Shanshui Cement · Huixian, Henan · 2019
The company reports 24.15% power savings for the replaced blower in 2019.